Uploaded image for project: 'Moodle'
  1. Moodle
  2. MDL-27733

Workshop phase deadlines not upgraded from 1.9 to 2.0

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Critical
    • Resolution: Fixed
    • Affects Version/s: 2.0.3
    • Fix Version/s: 2.0.4
    • Component/s: Workshop
    • Labels:
    • Testing Instructions:
      Hide

      Note: this can be effectively tested together with MDL-27734

      • In 1.9 Moodle, create a workshop instance
      • Set the submission phase start/end dates and assessment start/end dates
      • Upgrade the site to Moodle 2.0
      • TEST: make sure that the workshop has the phase deadlines set in the settings form
      Show
      Note: this can be effectively tested together with MDL-27734 In 1.9 Moodle, create a workshop instance Set the submission phase start/end dates and assessment start/end dates Upgrade the site to Moodle 2.0 TEST: make sure that the workshop has the phase deadlines set in the settings form
    • Workaround:
      Hide

      Set the values manually after the upgrade.

      Show
      Set the values manually after the upgrade.
    • Affected Branches:
      MOODLE_20_STABLE
    • Fixed Branches:
      MOODLE_20_STABLE
    • Pull from Repository:
    • Pull Master Branch:
      MDL-27733-workshop-deadlines

      Description

      Even when a workshop in 1.9 has submissionstart, submissionend, assessmentstart and assessmentend, these timestamps are not set when the site is upgraded to 2.0.

        Gliffy Diagrams

          Attachments

            Activity

            Hide
            mudrd8mz David Mudrák added a comment -

            Triaging for STABLE backlog as a critical issue (data loss)

            Show
            mudrd8mz David Mudrák added a comment - Triaging for STABLE backlog as a critical issue (data loss)
            Hide
            samhemelryk Sam Hemelryk added a comment -

            Looks good thanks David.
            Once I've checked with Eloy that it is OK for things to be sent upstream this can go in.

            Show
            samhemelryk Sam Hemelryk added a comment - Looks good thanks David. Once I've checked with Eloy that it is OK for things to be sent upstream this can go in.
            Hide
            samhemelryk Sam Hemelryk added a comment -

            Thanks David integrated now.

            Show
            samhemelryk Sam Hemelryk added a comment - Thanks David integrated now.
            Hide
            stronk7 Eloy Lafuente (stronk7) added a comment -

            Passing after commenting with David, thanks!

            Show
            stronk7 Eloy Lafuente (stronk7) added a comment - Passing after commenting with David, thanks!
            Hide
            stronk7 Eloy Lafuente (stronk7) added a comment -

            This is now upstream, yay! Many thanks!

            Show
            stronk7 Eloy Lafuente (stronk7) added a comment - This is now upstream, yay! Many thanks!

              People

              • Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:
                  Fix Release Date:
                  1/Aug/11